Поле DC | Значение | Язык |
dc.contributor.author | Kopey, B. | - |
dc.contributor.author | Khalimi, D. | - |
dc.date.accessioned | 2016-11-07T13:17:50Z | - |
dc.date.available | 2016-11-07T13:17:50Z | - |
dc.date.issued | 2015 | - |
dc.identifier.citation | Kopey, B. Optimization of eguipment availability of a gas-pumping unit = Оптимізація коефіцієнта готовності обладнання газоперекачувального агрегата / B. Kopey, D. Khalimi // Journal of Hydrocarbon Power Engineering. - 2015. - Vol. 2, № 2. - С. 48-51. | uk_UA |
dc.identifier.uri | http://elar.nung.edu.ua/handle/123456789/2104 | - |
dc.description.abstract | The control of mechanical equipment availability is based on the knowledge of its behaviour and thus optimizes the timing of corrective intervention. The equipment can operate both in good conditions and even in the state of degradation, causing the unscheduled high-cost intervention at any moment. During our study we have optimized turbocharger availability by
probabilistic modelling based on the turbocharger`s state parameters that define its degradation. | uk_UA |
dc.language.iso | en | uk_UA |
dc.publisher | Ivano-Frankivsk National Technical University of Oil and Gas | uk_UA |
dc.subject | availability | uk_UA |
dc.subject | bearing | uk_UA |
dc.subject | frequency repair | uk_UA |
dc.subject | maintenance costs | uk_UA |
dc.subject | optimization | uk_UA |
dc.subject | reliability | uk_UA |
dc.title | Optimization of eguipment availability of a gas-pumping unit | uk_UA |
dc.title.alternative | Оптимізація коефіцієнта готовності обладнання газоперекачувального агрегата | uk_UA |
dc.type | Article | uk_UA |
Располагается в коллекциях: | Journal of Hydrocarbon Power Engineering. - 2015. - Vol. 2, № 2
|